Custom Fabrication

Challenge

This ductwork is enormous. At 6ft round, simply moving this duct is a challenge. Many coordinated efforts were completed to get this job done on time.

Solution

Our custom metal fabricators created the duct to SMACNA standards in our metal shop. Piece by piece the duct was shipped to the job site. The sheer size of this duct created multiple trips. Using our skilled labor hands in the field, our installers installed the duct using accu-flange connections and our own hanger system. We then connected the duct to the provided scrubbers and blowers equalling 2 drops at the “pour” line and at the “curing” line. We then finished them out with custom dampers at each drop.

DEPARTMENTS:

Virtual Design, Specialty Fabrication, Installation

MARKET:

Food Industry

TIMELINE:

Within working hours

LOCATION:

Havre De Grace, Md

DESIGNER:

Mark Shaw

ESTIMATOR:

Mark Shaw

FOREMAN:

Dave Underwood & Jeremy Nagle

SPECIALTY FABRICATORS:

Sheet Metal Shop

PROJECT MANAGER:

Matt Knepper