OSS Medical Arts Building
Departments: Sheet Metal & Fabrication, Engineering (CAD & Design), Plumbing & HVAC
Market: Healthcare
Timeline: May to August
Location: West York, Pa
Size: 45,000 Square Feet
Problem: An aggressive seven-month construction schedule for a 3-story medical building
Solution: BIM model coordination from our CAD Department, led by Andy Kalbach and Greg Koontz, successfully coordinated our work with the building structure. With our building 3D model, we located over 700 hangers and penetrations in the building before the concrete was poured. Hangers were located and installed in only weeks, setting us ahead of schedule to concentrate on the install in the field with almost no downtime or rework in the field, which in turn affected our trade schedules with little to no conflicts. Our fabrication shop preassembled duct sections and loaded them into trailers for quick ductwork installation. We worked with Kinsley Construction and other subcontractors to implement PULL planning for each step of the construction and met every schedule and need that arose.
Walton & Company
Pennsylvania
1800 Industrial Hwy
York Pa 17402
717.755.9030
3320 Concord Road
York Pa 17402
717.840.2258
Md
150 Lakefront Dr
Cockeysville, Md 21039
410.891.8631
Contact Us Today!
Blog News
Happy Retirement Sharon McNeil!
Just shy of three months, Sharon would have had 21 years in with Walton & Company. It’s time to say goodbye to her Walton Family and Hello Retirement for Sharon McNeil. She adored the people […]