OSS Medical Arts Building

Departments: Sheet Metal & Fabrication, Engineering (CAD & Design), Plumbing & HVAC

Market: Healthcare

Timeline: May to August

Location: West York, Pa

Size: 45,000 Square Feet

Problem: An aggressive seven-month construction schedule for a 3-story medical building

Solution: BIM model coordination from our CAD Department, led by Andy Kalbach and Greg Koontz, successfully coordinated our work with the building structure. With our building 3D model, we located over 700 hangers and penetrations in the building before the concrete was poured. Hangers were located and installed in only weeks, setting us ahead of schedule to concentrate on the install in the field with almost no downtime or rework in the field, which in turn affected our trade schedules with little to no conflicts. Our fabrication shop preassembled duct sections and loaded them into trailers for quick ductwork installation. We worked with Kinsley Construction and other subcontractors to implement PULL planning for each step of the construction and met every schedule and need that arose.

 

Comments are closed.